Connections2energy

2025/26 Water Charges Now in Force: What Developers Need to Know

From 1 April 2025, all UK water companies introduced updated charges for new infrastructure connections, with significant cost implications for developers nationwide. These changes will…
man installing water pipe

From 1 April 2025, all UK water companies introduced updated charges for new infrastructure connections, with significant cost implications for developers nationwide. These changes will directly affect the cost of clean water and wastewater infrastructure on development sites, from one-off house builds to major housing schemes.

This update also marks a milestone change in how water companies recover costs, with the removal of the income offset, new environmental levies, and increased fees across pre-planning and non-contestable works.

map showing different water boards locations across england and wales

What’s Changed?

Income Offset Removed Nationwide

For years, developers benefited from a water income offset, a deduction applied to infrastructure charges to reflect future revenue water companies would earn from new connections.

From April 2025, this has been removed across England and Wales. That means:

  • You now pay the full cost of non-contestable infrastructure works
  • No automatic discounts on sewer or water mains costs
  • Applies to all new applications and Section 41/104 agreements from April onwards

This change aligns with Ofwat’s drive to simplify charging structures and ensure full cost transparency.

Introduction of Environmental Components

Alongside standard connection fees, many water companies now include a new environmental component in their infrastructure charges.

These are intended to help fund long-term goals such as:

  • Improving the resilience of local water networks
  • Reducing demand through water efficiency
  • Managing wastewater more sustainably
  • Supporting new drainage technologies like SuDS (sustainable drainage systems)

Although this might sound like a general improvement levy, it’s built into the regulated infrastructure charge, meaning it’s non-negotiable and applies per property.

Pre-Development Fees

Many UK water companies have introduced pre-development fees to cover the costs of early-stage services, including:

  • Capacity checks to assess network availability
  • Technical vetting of proposed connection designs
  • Requests for sewer and water network records
  • Pre-planning advice and feasibility assessments

These fees reflect the actual resource investment water companies make before any infrastructure work begins and are now charged separately rather than bundled within connection fees.

What this means for developers:

  • Budgets must now include these non-contestable fees early in the project
  • Pre-development fees are charged regardless of who completes the connection works
  • Accounting for these costs upfront helps avoid unexpected expenses and delays later

What We’re Seeing

We’ve seen connection quotes increase significantly under the new charging rules. For example, one Yorkshire Water quote jumped from £21,000 to £56,000, a 167% increase. Severn Trent also showed a notable rise, with charges on one site going up by 47%.

Non-Contestable Charges Are Regulated

All non-contestable charges are regulated by Ofwat and must be passed on directly, meaning:

  • All providers use the same rates for these works
  • You should see no major variation in like-for-like quotes

However, we’ve seen errors where:

  • Providers quote from outdated charging tables
  • Cost estimates based on the current cost structure, even when the build programme extends into the next charging period
  • Environmental levies are missed or duplicated
  • The offset is incorrectly assumed to still apply

Let Us Handle It

As your project management partner for utility infrastructure, we:

  • Get accurate, multi-utility quotes from all relevant water boards
  • Verify that charges, offsets and fees are applied correctly
  • Submit and manage all applications, approvals and technical handovers
  • Deliver clean, coordinated utility connections across water, electric, gas and fibre

Have a project?

Speak to a specialist with no obligation.

Related services

Multi-utility connections

Electric connections

Gas, water & more

recent articles

Industry news & practical guides for developers and contractors

Getting Utilities to Sports and Leisure Facilities

From Olympic-sized swimming pools to multi-screen cinemas and indoor ski slopes, today's leisure facilities are among the most utility-intensive developments in the commercial property sector. Understanding these demands from the earliest planning stages is critical...

Why Utility Feasibility Should Come Before Site Purchase

The difference between a profitable development and a financial headache often comes down to a single question asked too late: Can this site actually be connected to essential utilities? Every year, developers across the UK purchase sites that look perfect on paper....

2026/27 Water Charges Now in Force: What Developers Need to Know

From 1 April 2026, UK water companies across England and Wales will implement their new 2026/27 developer charging arrangements, bringing another round of significant increases to water and wastewater infrastructure costs. These rises will directly impact new...

Ready to discuss your project?

Speak to a specialist today. No obligation, just straightforward expert advice.

Site Address(Required)
Drop files here or
Max. file size: 50 MB.
    Upload any documents that will help us progress with your project here: Site location plans, site layout plans, meter positions, loadings and fixtures.